What is attached lifting scaffold?

It is an external scaffold with anti overturning and anti falling devices, which is erected at a certain height and attached to the engineering structure, and can climb or fall layer by layer with the engineering structure by relying on its own lifting equipment and devices.

Scope of application

It is suitable for high-rise building construction, especially for super high-rise buildings


Product Parameters

Structural Disassembly

REAL PHOTOS

Product Tags

Product Parameters

Name

Unit

Standard value

Note

Frame height

m

3-5 level of the floor

 

Frame width

m

0.6-0.9

Distance with the mainframe support and the building

Support span

m

≤6.0

Curve or broken distance    ≤5.4

Length of cantilever

m

≤2.0,and shall not be more than 1/2 support span

 

Average space between each hoist position

m

4m-5m

 

the vertical spacing of the frame

m

2

 

Anti-fall device

 

no less than three in any condition

The 24h/7days process works with the concept of non-falling

The minimum frame distance to the wall

mm

≤250

 

Frame weight

t/m

4.0-5.0 tons per extension meter

each extension meter along the horizontal peri-perith

The rate of the electric hoist

t

7.5

 

Climbing speed

mm/min

130

 

Electric hoist motor power

KW

0.5

single motor power

Time for raise one floor

h

0.5-2.0

Each set

The lift control of the frame

 

Remote control

One main control ,and hand on per person

The frame simultaneously lifts the load control

 

Alarm when 15% overload or underload occurs, and stop when 30% overload or underload occurs, realizing fully intelligent automatic control

 

Deviation allow for the pre-buried hold

mm

±50

 

The carrying capacity of the operating layer

KN/㎡

Two simultaneous:3.0, three simultaneous:2.0

 

Main features

1. Fast construction speed: the cantilever scaffold needs to be installed and removed continuously, and the climbing frame is raised one floor in 30 ~ 40 minutes, which can meet the protection needs of one floor in three days for structure construction and two floors in one day for decoration construction;

2. Good safety: multiple attachments and building exterior walls are adopted, and multiple horizontal protection is set. The operator is always within the protection range of the frame, which can effectively prevent falling objects and personnel falling.

3. Material saving: the climbing scaffold shall not be more than five floors high, and shall be lifted and lowered layer by layer according to the construction progress. Compared with the double row scaffold, it is erected from the ground to the top of the structure, saving a lot of steel pipes, fasteners, scaffold boards and safety nets;

4. Save the cost of tower crane shift: after the climbing frame is erected, the climbing frame can be lifted and lowered by using its own lifting system, saving a lot of cost of tower crane shift.

5. Save labor cost: after the climbing frame is erected, only a small number of personnel can lift the frame, saving a lot of labor.

6. Beautiful appearance.


  • Previous:
  • Next:

  • 1. Frame structure

    It is composed of three parts: vertical main frame, horizontal supporting truss, and frame structure.

    1

     

    2. Vertical main frame

    The main component of the attached lifting scaffold is perpendicular to the facade of the building and connected with the attached supporting structure. A vertical frame that mainly bears and transmits vertical and horizontal loads.

    2

    3. Horizontal supporting truss

    The width is the same as that of the main frame, parallel to the wall, and the height should not be less than 1.8m. A scaffold board should be set at the bottom layer, and a reversible sealed replica should be set between the building and the board. The bottom of the board should be a safety net. It mainly bears the vertical load of the frame and transmits the vertical load to the horizontal supporting structure of the vertical main frame.

    3

    4. Frame structure

    The frame body between two adjacent main frames and above the horizontal supporting truss.

    1) Vertical pole: set on the node of the horizontal supporting truss;

    2) Longitudinal horizontal rod, horizontal horizontal rod;

    3) Scissors support: set continuously, the horizontal angle is 45°~60°, and fasten with the extension end of the vertical pole or the horizontal horizontal pole.

    4) Dense mesh: 2000 mesh/100cm²

    5) The working layer is equipped with a 1.2m protective fence and 18cm high toe board.

    4

    5. The height of the frame

    The distance from the axis of the rods at the bottom of the frame to the axis of the crossbar (ie guardrail) at the top of the frame. (Not more than 5 times the height of the floor)

    6

    6. Width of the frame

    The horizontal distance between the axis of the vertical poles inside and outside the rack. (Not greater than 1.2m)

    7

     

    7. Support span

    The distance between the central axis of two adjacent vertical main frames.

    The support span of the frame in the linear arrangement of the main frame of the guide rail shall not be greater than 7m, and the support span of the frame arranged in a broken line or curve (the distance between the outer sides of the frame at the support points of two adjacent main frames) shall not be greater than 5.4m.

    7

    Broken line layout frame

    Notice:

    1) The material platform shall not be connected to each part of the scaffolding and each structural member, and its load shall be directly transmitted to the construction engineering structure.

    2) The disconnection should be closed.

     

    8. Cantilever height

    The height of the frame above the highest support point in the attachment support structure of the frame. (Not greater than 2/5 of the height of the frame, and not greater than 6m)

    8

     

     

    9. Cantilever length

    Refers to the horizontal cantilever length of the frame, that is, the horizontal distance from the vertical axis of the main frame of the frame to the vertical surface of the end of the frame.

    The horizontal cantilever length of the frame shall not be greater than 2m, and shall not be greater than 1/2 of the span.

    9

     

    Length of overhanging section: L1

    Length of anchoring section: L2

    L2≥1.25L1

    Note: the difference between the concept of the length of the overhanging section and the overhanging scaffolding.

     

    10. Anti-overturning device

    A device to prevent the frame from overturning during lifting and use.

    10

     

     

    11. Anti-falling device

    A device that prevents the frame from accidentally falling during lifting or use.

    11.1

     

    Use the steel pipe clip to fix it after the lifting is finished, and be careful to remove it when lifting again.

    11

    12. Lifting mechanism

    The power mechanism for controlling the lifting movement of the frame is electric

    12

     

    13.Load control system

    A device that can reflect and control the load that the lifting mechanism bears during work.

    1

    14. Cantilever beam

    One end is fixed on the wall-attached support to suspend the cantilever steel beam of the lifting equipment or the anti-fall device, also known as the suspension beam.

    2

    15. Guide rail

    Attached to the wall supporting structure or attached to the vertical main frame to guide the scaffolding up and down rails.

    3

    16. Synchronous control device

    During the lifting and lowering process of the frame, the lifting speed of each lifting point is controlled so that the load or height difference of each lifting point is within the design range.

    17. Attached wall support

    The wall-attached support is the attachment supporting structure of the lifting frame, which bears and transmits the load of the lifting frame, and at the same time, realizes the jam protection function under the accidental fall condition through the anti-falling device set inside it. It integrates load-bearing, anti-falling, anti-tilting, and guiding functions, and can better adapt to the verticality of the structure, the error of the reserved embedded pipe and the smaller deviation.

    4

    The wall-attached support is welded, processed and assembled by steel. The guide rail of the guide rail main frame is inserted into the guide wheel seat, and the sliding cooperation between the guide roller and the guide rail is used to restrict the main frame of the guide rail from moving up and down.

    The distance between the lifting frame and the engineering structure can be adjusted by adjusting the adjusting bolts, and the adjustment range is 180±25mm.

    1.JPG

    18. Conversion device

    (1) Triangle iron parts

    When the exterior of the main structure is a balcony or other overhanging slabs, and the main frame here cannot be properly installed on the wall or beam, consider using triangular irons for conversion to ensure the normal installation of the wall-attached support.    

    5(2) Spacer

    When there are 200-300mm wide horizontal decorative eaves on the periphery of the structure, it is used to appropriately widen the distance between the frame and the structure to ensure the smooth construction of the structure and the lifting of the frame. There are a variety of models to choose from.

    (3) Heightening parts

    When there is an air-conditioning board or bay window board with a width of 300mm~600 mm on the periphery of the structure, it is used to appropriately widen the distance between the frame and the structure to ensure the smooth construction of the structure and the lifting of the frame. There are a variety of models to choose from.

    6

    (4) Hanging parts

    Used for hanging the electric hoist, using M30 anchor bolts to firmly connect with the engineering structure, and transfer the load of the frame body to the load-bearing parts of the engineering structure during lifting. It is divided into ordinary hanging parts, extended hanging parts, channel steel hanging parts, and small hanging parts. Several kinds.

    Productoin workshop

    1 (5) 1 (4) 1 (3) 1 (2) 1 (1) 12

    Finished product drawing

    1 (1) 1 (2) 1 (3) 1 (4) 1 (5) 13

    Detail display

    1 (1) 1 (2) 1 (3) 1 (4) 1 (5) 123456

    Customer investigation

    1 (1) 1 (2) 1 (3) 1 (4) 23 (1) 23 (2)

    Type of shipping

    mmexport1635211011628 mmexport1635211279669 mmexport1635211282930

    Setup script

    mmexport1635211041572 mmexport1635211052014 mmexport1635211602226 mmexport1635211617038 mmexport1635211622603 mmexport1635211052014

    Application case

    4cb65a1447b631f20ca921a2fa38a42 mmexport1635211028515 mmexport1635211142250 mmexport1635211335479 mmexport1635211415995 56

    Comparison of old and new scaffolds

    1 2 3
  • Write your message here and send it to us